Rogz Control Long Lead
In store only
$57.93
Selected Colour
Black
$57.93
8.69
in Brand Cash back
Buy now, pay later options availableLearn more
Product availability
Description
Reviews
The Control Lead by Rogz is the perfect lead for taking control of your dog on walks. Having control of your dog is essential for a happy dog and a happy owner, and the right type of walking equipment can help.
Shock Absorbing Webbing - Eases the pull strength and pressure placed on your dog.
ShocLoc Control - Designed to lock out the absorbing function of the bungee.
SnapLoc Trigger Hook - Ensures control and safety for you and your dog.
Reflective Stiching - Reflective Yarn woven into webbing and piping for night visibility.
Waste Bag Holder - Accessory to hold your waste bag.
Materials:
Webbing and Reflective Stiching: Nylon/Polyester
Shock Absorber: Neoprene
Metal Parts: Zinc
No reviews yet
Essential ReadingRead all