Petstock logo
HomeRight caret
DogRight caret

Rogz Control Long Lead

In store only

$57.93

Product Image Coming Soon

$57.93

Cash back
$8.69

in Brand Cash back

Learn more
Collect 58 Everyday Rewards points
Login/create an account
to link your card
Product availability

Description

Ingredients

Reviews

The Control Lead by Rogz is the perfect lead for taking control of your dog on walks. Having control of your dog is essential for a happy dog and a happy owner, and the right type of walking equipment can help.

Shock Absorbing Webbing - Eases the pull strength and pressure placed on your dog.

ShocLoc Control - Designed to lock out the absorbing function of the bungee.

SnapLoc Trigger Hook - Ensures control and safety for you and your dog.

Reflective Stiching - Reflective Yarn woven into webbing and piping for night visibility.

Waste Bag Holder - Accessory to hold your waste bag.

Materials:

Webbing and Reflective Stiching: Nylon/Polyester

Shock Absorber: Neoprene

Metal Parts: Zinc

No reviews yet

Essential ReadingRead allRight caret
Locations
Follow us on
FacebookInstagramYoutubeTiktok

Checkout Securely

VisaMastercardAmexAfterpay

© 2025 Petstock Group All rights reserved.

Privacy Policy

Terms

Petstock Group